Feedstock Preparation
The process starts by preparing the incoming biomass — removing unwanted material, reducing its size, and creating the right mix for efficient digestion.
The goal: give the plant a consistent, high-quality feed
CBG Plant — Process Technology
The journey from waste to clean fuel happens in stages. Get one wrong, and the entire plant feels it.
The process starts by preparing the incoming biomass — removing unwanted material, reducing its size, and creating the right mix for efficient digestion.
The goal: give the plant a consistent, high-quality feed
Prepared biomass enters the digester, where naturally occurring microorganisms break it down without oxygen and produce biogas.
The goal: maximise biogas production while keeping the process stable
Raw biogas contains impurities such as hydrogen sulphide. These are removed to protect the equipment and prepare the gas for upgrading.
The goal: clean the gas before it moves further through the plant
Moisture is removed from the gas to protect downstream equipment and improve the quality and reliability of the final product.
The goal: deliver clean, dry gas ready for upgrading
Carbon dioxide is separated from the biogas, increasing the methane concentration and converting raw biogas into Compressed Bio-Gas suitable for CNG-equivalent applications.
The goal: produce high-quality renewable gas
The upgraded gas is compressed and stored for transportation, cascade filling, or suitable gas-grid applications. The remaining digestate can be processed into organic fertiliser.
Cascade filling at approximately 200–250 bar
Stage 02 in detail
Not every feedstock behaves the same way. That's why we don't force every project into the same digester design. We select the system based on what you have, how it behaves, and what the plant needs to achieve.
For wet and pumpable feedstock.
A continuously stirred system keeps the feedstock mixed and consistent, allowing microorganisms to work efficiently throughout the digester.
Best suited to
For higher-solids and fibrous feedstock.
A plug flow system moves the material gradually through the digester, making it suitable for feedstocks that are too dry, fibrous, or difficult to mix in a conventional stirred tank.
Best suited to
Core Equipment
The heart of the plant.
CSTR or Plug Flow digesters are selected based on the feedstock, plant capacity, and operating requirements.
Protecting the system.
H₂S removal systems clean the raw biogas and protect compressors, upgrading equipment, and other downstream systems.
Keeping production stable and safe.
Gas storage provides a buffer between production and upgrading, while the flare safely handles excess gas when required.
Turning biogas into CBG.
Water scrubbers, PSA, membrane systems, or other suitable technologies separate unwanted gases and increase methane concentration.
Ready for the market.
The upgraded gas is compressed and stored in high-pressure cascades for transportation, dispensing, or suitable gas-grid applications.
Nothing valuable goes to waste.
The remaining digestate can be separated, processed, dried, and converted into organic fertiliser products such as FOM and LFOM.
Technical enquiry
Share your feedstock type, approximate quantity, and location with us. We'll help you explore the suitable process, technology, and plant configuration for your project.
Anantaa Assistant
Usually answers instantly
Hi, I'm the Anantaa Green Energy assistant. Ask me about our services, technology, or how to get in touch — I'll do my best to help.